Sistem Informasi Penelusuran Perkara
PENGADILAN NEGERI PALANGKARAYA
INFORMASI DETAIL PERKARA



Nomor Perkara Penuntut Umum Terdakwa Status Perkara
7/Pid.Sus-TPK/2024/PN Plk 1.ANGGA WIJAYA, S.H.
3.I WAYAN SURYAWAN, S.H.
4.Sustine Pridawati, S.H.
5.Suhadi, S.H.
TOMMY FIRMANSYAH Tuntutan
Tanggal Pendaftaran Jumat, 16 Feb. 2024
Klasifikasi Perkara Tindak Pidana Korupsi
Nomor Perkara 7/Pid.Sus-TPK/2024/PN Plk
Tanggal Surat Pelimpahan Kamis, 15 Feb. 2024
Nomor Surat Pelimpahan B-209/O.2.17/Ft.1/02/2024
Penuntut Umum
NoNama
1ANGGA WIJAYA, S.H.
2I WAYAN SURYAWAN, S.H.
3Sustine Pridawati, S.H.
4Suhadi, S.H.
Terdakwa
NoNamaPenahanan
1TOMMY FIRMANSYAH[Penahanan]
Penasihat Hukum Terdakwa
NoNamaNama Pihak
1M. AIDIL FITRISYAH, S.H.TOMMY FIRMANSYAH
2DWIKALAM SYAHDANIA, S.H.TOMMY FIRMANSYAH
Dakwaan

PRIMAIR :

--------  Bahwa Terdakwa TOMMY FIRMANSYAH selaku Manager PT. Geoservices Cabang Mojokerto dalam kedudukannya sebagai Surveyor berdasarkan Keputusan Menteri Energi Dan Sumber Daya Mineral Republik Indonesia Nomor : 228.K/MB.01/ MEM.B/2022 tanggal 12 September 2022 Tentang Penetapan PT. Geoservices Sebagai Surveyor Untuk Verifikasi Analisa Kuantitas Dan Kualitas Penjualan Batubara jo Keputusan Direktur Jenderal Mineral Dan Batubara Nomor : 1052.K/30/DJB/2014 tanggal 30 Desember 2014, dan Perjanjian Tentang Pekerjaan Jasa Survey Analisa Kuantitas dan Kualitas Batubara Yang Diangkut Dengan Tongkang/Kapal Untuk PLTU Rembang No. Pembangkitan Jawa-Bali : 011.PJ/061/2021 No. PT. Geoservices : 321.GS/SK/2021 tanggal 29 Maret 2021 antara PT. Pembangkitan Jawa Bali (PJB) dan PT. Geoservices, sebagai yang melakukan atau turut serta melakukan bersama-sama dengan saksi REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global (dilakukan penuntutan secara terpisah), pada hari Jumat tanggal 20 Mei 2022 dan hari Minggu tanggal 20 Nopember 2022 atau setidak-tidaknya pada waktu lain dalam bulan Mei 2022 dan bulan Nopember 2022 atau setidak-tidaknya dalam tahun 2022 bertempat di Kantor Cabang PT. Geoservices di Mojokerto di Jalan Empu Nala Mojokerto, atau setidak-tidaknya di suatu tempat tertentu yang berdasarkan Pasal 84 ayat (2) KUHAP Pengadilan Tindak Pidana Korupsi pada Pengadilan Negeri Palangka Raya berwenang memeriksa dan mengadili perkara ini berdasarkan ketentuan Pasal 35 ayat (2) Undang-undang Nomor : 46 tahun 2009 tentang Pengadilan Tindak Pidana Korupsi, secara melawan hukum, telah melakukan perbuatan yaitu dalam melaksanakan tugasnya melakukan penentuan kuantitas dan pemeriksaan kualitas batubara yang dikirim oleh PT. Borneo Inter Global (selanjutnya disebut PT. BIG) ke PLTU Rembang dengan menerbitkan Certificate of Sampling and Analysis (CoA) yang berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya,  yaitu CoA tanggal 20 Mei 2022 Cert. No.09722.00113 Shipment No.2888 dan CoA tanggal 20 November 2022 Cert. No.09722.00209 Shipment No.2984, yang keduanya ditandatangani oleh Terdakwa, sehingga bertentangan dengan Peraturan Menteri ESDM No. 26 Tahun 2018 Tentang Pelaksanaan Kaidah Pertambangan Yang Baik dan Pengawasan Pertambangan Minerel Dan Batubara Pasal 30 ayat (1) dan (2), Keputusan Direktur Jenderal Mineral dan Batubara Kementerian Energi dan Sumber Daya Mineral Nomor : 195.K/30/DJB/2020 tanggal 8 Juli 2020 Tentang Tata Cara Verifikasi Teknis Kegiatan Pengangkutan Dan Penjualan Mineral Dan Batubara, Lampiran I angka 4, dan Keputusan Menteri Energi Dan Sumber Daya Mineral Republik Indonesia Nomor : 228.K/MB.01/MEM.B/2022 tanggal 12 September 2022 Tentang Penetapan PT. Geoservices Sebagai Surveyor Untuk Verifikasi Analisa Kuantitas Dan Kualitas Penjualan Batubara jo Keputusan Direktur Jenderal Mineral Dan Batubara Nomor : 1052.K/30/DJB/ 2014 tanggal 30 Desember 2014 serta Perjanjian Tentang Pekerjaan Jasa Survey Analisa Kuantitas dan Kualitas batubara Yang Diangkut Dengan Tongkang/Kapal Untuk PLTU Rembang No. Pembangkitan Jawa-Bali : 011.PJ/061/2021 No. PT. Geoservices : 321.GS/SK/2021 tanggal 29 Maret 2021 antara PT. Pembangkitan Jawa Bali (PJB) dan PT. Geoservices, Pasal 2 angka 11 huruf a angka 2 dalam pengadaan batubara oleh PT. BIG Ke PLTU Rembang, sehingga memperkaya diri sendiri atau orang lain atau suatu koorporasi yaitu saksi REZKY RUMBOGO HERYANTO sebesar Rp.4.985.422.769,- (empat milyar sembilan ratus delapan puluh lima juta empat ratus dua puluh dua ribu tujuh ratus enam puluh sembilan rupiah), yang dapat merugikan Keuangan Negara atau Perekonomian Negara sebesar Rp. 4.985.422.769,00 (empat milyar sembilan ratus delapan puluh lima juta empat ratus dua puluh dua ribu tujuh ratus enam puluh sembilan rupiah), yang dilakukan dengan cara sebagai berikut : -----------------------------------------------------------------------------------

-  Bahwa pada tanggal 21 Januari 2022 PT. PLN (Persero) menunjuk REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global (BIG) untuk penanganan keadaan darurat (emergency) pasokan batubara PLTU PT. PLN (Persero) dengan Surat Nomor : 4824/EPI.01.01/C01050200/2022-R untuk melaksanakan pasokan batubara dengan volume sebesar 15.000 MT (opsi swing + 30%) dengan  jangka waktu kontrak sampai dengan 31 Januari 2022, dengan rencana pasokan batubara sebagai berikut :

  • Pengapalan Pertama :

-  Sumber tambang  :  Koperasi Lintas Usaha Bartim ;

-  Jetty Loading         :  Jetty Bangun Nusantara Jaya Makmur ;

-  Tanggal loading    :  27-28 Januari 2022 ;

-  ETA                         :  6 Februari 2022 ;

-  Tujuan                    :  PLTU Rembang ;

-  Volume Muat         :  7500 MT ; dan

  • Pengapalan Kedua :

-  Sumber tambang  :  Koperasi Lintas Usaha Bartim ;

-  Jetty Loading         :  Jetty Bangun Nusantara Jaya Makmur ;

-  Tanggal loading    :  29-30 Januari 2022 ;

-  ETA                         :  8 Februari 2022 ;

-  Tujuan                    :  PLTU Rembang ;

-  Volume Muat         :  7500 MT ; dan

  • Spesifikasi batubara sebagai berikut :

-  Gross Calorie Value (ar, Kcal/Kg)    :  4200, batas penolakan :  < 4000>

-  Total Moisture (ar %)                          :  32,00 batas penolakan :  >38,00

-  Total Sulphur (ar %)                           :  0,57, batas penolakan  :  > 0,80

-  Ash (ar %)                                            :  4,86, batas penolakan  :  > 7

-  Hardgrove Grindability Index (HGI)  :  45, batas penolakan     :  < 43> 65

-  Bahwa pada tanggal 12 Maret 2022 saksi REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global (BIG) menerbitkan Shipping Instruction Nomor : 07/SI/BIG-LMN/III/2022 yang ditujukan kepada :

  1. PT. Kalinapu Barito Timur
  2. Koperasi Lntas Usaha Bartim
  3. Jetty Bangun Nusantara Jaya Makmur
  4. Surveyor Asiatrust Technovima Quality (ATQ)

Dengan isi yaitu :

  • Nama Tongkang dan Tugboat    :  TB LUMENA 06  (GT 204) / BG. APC 18 (GT 3143)
  • Pengirim                                         :  PT. Borneo Inter Global ;
  • Dengan tujuan                               :  PLTU Rembang - jawa Tengah
  • Rencana Pengapalan                  :  15-16 Maret 2022
  • Volume                                            : 7.500 MT
  • Jenis Cargo                                    : Batubara ;
  • Pelabuhan Muat                            :  Jetty Bangun Nusantara Jaya Makmur (BNJM) Kalimantan Tengah ;
  • Pelabuhan Bongkar                      :  PLTU Rembang Jawa Tengah ;
  • Surveyor                                         :  PT. Asiatrust Technovima Quality (ATQ)

Untuk menerbitkan :

  1. Bill of Loading (B/L) ;
  2. Certificate of Sampling and Analysis
  3. Certificate of Weight ;
  4. Certificate of Origin
  5. LHV, RKBM Royalti, Rekom Distamben
  6. Surat Keterangan Asal Barang ;
  7. Surat Pengiriman Barang

-  Bahwa untuk pengiriman/pengapalan I (pertama) batubara oleh PT. BIG ke PLTU Rembang, Koperasi Lintas Usaha Bartim (KLUB) menerbitkan Surat Keterangan Asal Barang (SKAB) tanggal 22 April 2022 yang menerangkan bahwa batubara yang diangkut dengan Tongkang TB LUMENA 06  (GT 204) / BG. APC 18 (GT 3143) sebanyak 7.560,684 MT berasal dari Lokasi Tambang/IUP OP Desa Kandris Kec. Karusen Janang, Kab. Barito Timur Kalimantan Tengah, milik Koperasi Lintas Usaha Bartim ;

-  Bahwa Koperasi Lintas Usaha Bartim (KLUB) merupakan Badan Usaha pemegang Izin Usaha Pertambangan Operasi Produksi (IUP OP) Nomor 384 Tahun 2014 tanggal 04 Desember 2014;

-  Bahwa berdasarkan Rencana Kerja Dan Anggaran Biaya (RKAB) KLUB tahun 2021 sampai dengan tahun 2022 kualitas siap jual batubara yaitu :

  • CV    : 2.700 s/d 3.200 Kcal/Kg gar
  • TM    : 48-56 % gar
  • IM      : 12-13 ?b
  • TS     : 0,7-0,88 % gar
  • Ash   : 4-8% gar

-  Bahwa sebelum pengapalan I (pertama) batubara yang akan dikirim ke PLTU Rembang, REZKY RUMBOGO HERYANTO menghubungi DAVID PANGIHUTAN HUTAURUK dan meminta supaya mengkondisikan pemeriksaan kualitas batubara kepada Surveyor muat agar sesuai dengan kualitas yang diminta oleh PT. PLN (Persero) dan untuk itu REZKI RUMBOGO HERYANTO memberikan biaya/fee sebesar Rp.26.000,- per MT dengan rincian Rp.25.000,- untuk surveyor muat maupun bongkar dan Rp.1.000,- untuk saksi David Pangihutan Hutauruk, kesepakatan tersebut direalisasikan oleh saksi Rezky Rumbogo Heryanto  dengan mentrasfer uang ke saksi David Pangihutan Hutauruk sebesar total Rp. 375.000.000,- ;

-  Bahwa pada saat muat (loading) batubara untuk pengapalan I (pertama) tanggal 19 Maret 2022 sampai dengan tanggal 21 April 2022 BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) memerintahkan RIZKY, RIZALI dan HAMDANI untuk mengambil sample batubara yang akan dikirim oleh PT. BIG ke PLTU Rembang yang berasal dari Koperasi Lintas Usaha Bartim (KLUB) di Pelabuhan Bangun Nusantara Jaya Makmur (BNJM) di Desa Rangga Ilung Kecamatan Jenamas Kab. Barito Timur padahal RIZKY, RIZALI dan HAMDANI tidak terdaftar sebagai Sampler pada Daftar Petugas Surveyor Mineral dan Batubara Teregistrasi di Direktorat Jenderal Mineral dan Batubara sehingga RIZKY, RIZALI dan HAMDANI tidak kompeten melakukan pengambilan sample;

-  Bahwa BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) kemudian dihubungi oleh DAVID PANGIHUTAN HUTAURUK melalui WA untuk menerbitkan Certificate of Sampling and Analysis (CoA), Certificate of Weight (CoW) dan Draught Survey Report (DSR) saja tidak perlu menerbitkan Laporan Hasil Verifikasi (LHV) ;

-  Bahwa atas permintaan dari DAVID PANGIHUTAN HUTAURUK tersebut maka untuk pengapalan I (pertama) batubara yang akan dikirim oleh PT. BIG ke PLTU Rembang BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) tidak menerbitkan Laporan Hasil Verifikasi (LHV) karena tidak melakukan verifikasi teknis kegiatan pengangkutan dan penjualan batubara pada aplikasi Modul Verifikasi Penjualan (MVP) namun BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) menerbitkan Certificate of Sampling and Analysis (CoA) dan Certificate of Weight (CoW) dan Draught Survey Report (DSR) masing-masing tanggal 25 April 2022 Nomor : 05.22.0053 dimana CoA yang diterbitkan berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya. Dokumen  tersebut dipakai oleh REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG sebagai kelengkapan dokumen untuk pengiriman/pengapalan I (pertama) batubara ke PLTU Rembang sebanyak 7.560,684 MT dengan menggunakan Tongkang/Tugboat : TB Lumena 06 /BG.APC 18;

-  Bahwa selain menggunakan CoA, CoW dan DSR dari PT. ATQ untuk melengkapi dokumen pengiriman/pengapalan I (pertama) batubara ke PLTU Rembang sebanyak 7.560,684 MT dengan menggunakan Tongkang/Tugboat : TB Lumena 06 /BG.APC 18 tersebut, REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG juga menggunakan Laporan Hasil Verifikasi (LHV) yang diterbitkan oleh PT. Indo Borneo Inspeksi Services (IBIS) No. LHV : 097/02/IBIS-MINERBA/IV/22 tanggal 23 April 2022, dengan demikian yang terverifikasi dalam Aplikasi Modul Verifikasi Penjualan (MVP) adalah CoA dan CoW yang diterbitkan oleh PT. IBIS dan bukan CoA dan CoW yang diterbitkan oleh Terdakwa selaku Surveyor ;

-  Bahwa CoA tanggal 25 April 2022 Nomor : 05.22.0053 yang diterbitkan oleh PT. Asiatrust Technovima Quality (ATQ) juga berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batu bara yang sebenarnya yaitu Gross Calorific Value (As Received Basis) 4.243 kcal/kg padahal Gross Calorific Value (As Received Basis) batubara yang berasal dari IUP OP Koperasi Lintas Usaha Bartim (KLUB) hanya berkisar antara 2.700 kcal/kg s/d 3.200 kcal/kg ;

-  Bahwa REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG juga menggunakan CoA dan CoW masing-masing tanggal 25 April 2022 Nomor : 05.22.0053 yang diterbitkan oleh PT. Asiatrust Technovima Quality (ATQ) untuk melengkapi persyaratan untuk bisa berkontrak dengan PT. PLN (Persero) untuk pengadaan batubara dalam keadaan darurat (emergency) dan dengan adanya CoA yang diterbitkan oleh PT. Asiatrust Technovima Quality (ATQ) tersebut yang berisi data bahwa Gross Calorific Value batubara yang berasal dari IUP OP KLUB adalah 4.243 kcal/kg sehingga memenuhi spesifikasi yang ditentukan oleh PT. PLN (Persero) dan juga sesuai dengan penawaran yang diajukan oleh PT. BIG serta sesuai juga dengan hasil rapat antara PT. PLN (Persero) dengan PT. BIG melalui Video Conference yang menyepakati spesifikasi batubara yang akan dipasok oleh PT. BIG ke PLTU Rembang adalah pada kalori 4.200 kcal/kg, kemudian PT. PLN (Persero) dan PT. Borneo Inter Global membuat Perjanjian Jual Beli Batubara (PJBB) Nomor PLN : 0243.Pj/EPI.01.01/C01050200/2022, Nomor Pemasok : - tanggal 26 April 2022 yang ditandatangani oleh Executive Vice Presiden Batu Bara PT. PLN (Persero) dengan REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global, yang isinya antara lain :

  • Spesifikasi :
  1. Batubara yang dijual berdasarkan PJBB ini wajib memiliki spesifikasi tipikal sebagaimana dimaksud dalam Lampiran I PJBB ini ;
  2. Pemasok wajib menyerahkan batubara homogen, dan menjamin tidak mengandung bahan-bahan logam/magnetis, kotoran-kotoran serta bahan-bahan non logam lainnya dan menjamin batubara yang dikirim memenuhi semua spek legal yang ditetapkan oleh Pemerintah serta menjamin kondisi batubara di dalam kapal tongkang/vessel tidak terpadatkan, tidak berdebu, tidak lengket, dan mudah untuk dibongkar. Untuk menjamin agar batubara tidak berdebu saat dibongkar di pelabuhan bongkar, apabila diperlukan maka pemasok akan melakukan injeksi bahan kimia pada saat batubara dimuat di pelabuhan muat.
  3. Pemasok dilarang menggunakan bahan-bahan kimiawi untuk dicampurkan pada batubara guna merubah kualitas batubara. Apabila ditemukan adanya pencampuran bahan-bahan kimiawi tersebut :
  1. PLN berhak melakukan penolakan pembayaran batubara dalam hal batubara belum dibayar oleh PLN ; atau
  2. Pemasok akan membayar ganti rugi kepada PLN dalam hal batubara telah dibayar oleh PLN sebagaimana diatur dalam Pasal 29 PJBB ini ;
  • Penurunan harga atas batubara yang tidak sesuai.

Apabila PLN memutuskan untuk tetap menerima batubara yang tidak sesuai sebagaimana dimaksud dalam Pasal 9.3.1.3, maka harga FOB Tongkang/Vessel bulanan (Pfobm) atas batubara yang tidak sesuai harus dikenakan penyesuaian harga sesuai Pasal 7.1 dan selanjutnya dikenakan penurunan harga berdasarkan ketentuan sebagai berikut :

  1. Tabel Penurunan Harga atas Batubara Yang Tidak Sesuai I.
  1. Nilai Kalori kcal/Kg (ar) :
    • batas penolakan : <3>
    • penurunan harga : 50%
  1. Tabel Penurunan Harga atas Batubara Yang Tidak Sesuai II.
  1. Nilai Kalori kcal/Kg (ar) :
    • batas penolakan : <4>
    • penurunan harga : 10%
  2. Total Moisture (ar) :
    • batas penolakan : > 38
    • penurunan harga : 5%
  3. Sulphur (ar) :
    • batas penolakan : > 0,8
    • penurunan harga : 5%
  4. Ash (ar) :
    • batas penolakan : >7
    • penurunan harga : 5%
  5. Hardgrove Grindability Index :
    • batas penolakan : < 43> 65
    • penurunan harga : 5%

-  Bahwa selain spesifikasi batubara yang disekapati dalam Perjanjian Jual Beli Batubara, disepakati pula batubara yang dikirim ke PLTU Rembang semuanya sudah dalam bentuk Crushing Coal (sudah dihancurkan) sebagaimana spesifikasi teknis yang tercantum dalam KAK dengan sizing (ukuran) kurang dari (<) 50 mm;

-  Bahwa REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global ternyata mengirimkan batubara yang sebagian masih dalam bentuk bongkahan (raw coal) sehingga tidak sesuai dengan kesepakatan yang dibuat ;

-  Bahwa proses muat batubara ke atas tongkang di Pelabuhan (Jetty) BNJM dilakukan dengan menggunakan dump truck (trucking) tidak menggunakan compeyor, oleh karena batubara yang akan dimuat ke tongkang sebagian besar masih berbentuk bongkahan (raw coal) sehingga apabila dimuat menggunakan compeyor akan merusak compeyor, kecuali lapisan teratas dimuat secara curah menggunakan compeyor karena batubaranya sudah dicrusher dengan tujuan pada saat dilakukan checking visual di pelabuhan bongkar terlihat seolah-olah batubara yang dimuat semuanya sudah dicrushing dan dimuat secara curah;

-  Bahwa untuk pengiriman/pengapalan batubara ke PLTU Rembang PT. PLN (Persero) melalui Unit Bisnisnya yaitu PT. Pembangkitan Jawa Bali (PJB) menunjuk :

1.   PT. Geoservies sebagai Surveyor Bongkar berdasarkan Perjanjian Tentang Pekerjaan Jasa Survey Analisa Kuantitas dan Kualitas Batubara Yang Diangkut Dengan Tongkang/Kapal Untuk PLTU Rembang No. Pembangkitan Jawa-Bali : 011.PJ/061/2021 tanggal 29 Maret 2021 ; dan

2.   PT. Haleyora Powerindo selaku Penyedia Jasa Supervisi Penentuan Kuantitas dan Pemeriksaan Kualitas serta Verifikasi Tagihan Batubara berdasarkan Perjanjian Tentang Pengadaan Pekerjaan Jasa Supervisi Penentuan Kuantitas dan Kualitas Batubara (Pendampingan) dan Verifikasi Tagihan Batubara UBJ O&M Tahun 2022 Nomor PT. Pembangkitan Jawa Bali : 083.PJ/061/2021, Nomor PT. Haleyora Powerindo : 0001.PJ/613/HPI/XII/2021, tanggal 30 Desember 2021 ;

-  Bahwa pengiriman/pengapalan I (pertama) batubara yang dikirim oleh PT. BIG ke PLTU Rembang sebanyak 7.560.684 MT tiba di PLTU Rembang pada tanggal 3 Mei 2022 dan dilakukan pembongkaran pada tanggal 15 Mei 2022, dan sesuai Log Book Activity Of Barge Inspector (Time Sheet) tanggal 15 Mei 2022 yang dibuat oleh Surveyor PT. Geoservices terdapat beberapa kegiatan yang berhenti (Stopped) atau tertunda (delayed), yaitu :

  • Date May 14,2022.
  • Time 21.30-03.20 No Activity, Treatment for Sef Combution Cargo ;
  • Date May 15, 2022.
  • Time 09.00-09.30 Stop Disch, Wet cargo realization and cleaning JT02;
  • Time 10.50-11.10 Stop Disch, Wet cargo realization and cleaning JT02;
  • Time 13.25-13.45 Stop Disch, Wet cargo realization and Cleaning JT01;
  • Time 15.30-15.55 Stop Disch, Wet cargo realization and cleaning JT02;
  • Time 17.00-17.25 Stop Disch, Wet cargo realization and cleaning JT02;
  • Time 17.30-17.40 Wheel Loader transfer to Barge for cleaning ;
  • Time 19.30-19.40 Wheel Loader out from Barge ;
  • Bahwa berdasarkan catatan tersebut telah terbakarnya batu bara diatas tongkang dan terjadi 5 kali kegiatan pembongkaran terhenti harus dilakukan pembersihan jalur pembongkaran;

-  Bahwa kondisi yang terjadi pada saat dilakukan pembongkaran batubara tersebut menunjukkan indikasi kadar kalori batubara yang dikirim oleh PT. BIG ke PLTU Rembang pada pengiriman/pengapalan I (Pertama) benilai rendah ;

-  Bahwa untuk penentuan kuantitas dan analisa kualitas batubara pengiriman I (pertama) oleh PT. BIG ke PLTU Rembang tersebut dilakukan oleh PT. Geoservices Cabang Mojokerto ;

-  Bahwa Terdakwa selaku Manajer PT. Geoservices Cabang Mojokerto yang ditugaskan untuk melakukan penentuan kuantitas dan pemeriksaan kualitas batubara yang dikirim oleh PT. BIG ke PLTU Rembang tersebut kemudian menerbitkan Certificate of Sampling and Analisys (CoA) tanggal 20 Mei 2022 Cert. No.09722.00113 Shipment No.2888 yang berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya dan CoA tersebut kemudian ditandatangani oleh Terdakwa ;

-  Bahwa perbuatan Terdakwa tersebut bertentangan dengan :

  1. Peraturan Menteri ESDM No.26 Tahun 2018 Tentang Pelaksanaan Kaidah Pertambangan Yang Baik dan Pengawasan Pertambangan Minrel Dan Batubara Pasal 30 ayat (1) dan (2) yang berbunyi :
  • Pasal 30 ayat (1) huruf a :
  1. Pelaksanaan kegiatan penjualan mineral dan batubara sesuai dengan kualitas dan kuantitasnya yang telah disetujui didalam RKAB Tahunan ;
  • Pasal 30 ayat (2) :
  1. Kualitas dan Kuantitas meniral atau batubara sebagaimana dimaksud dalam ayat 1 huruf a yang akan dijual di dalam negeri wajib diverifikasi oleh Surveyor Pelaksana yang ditetapkan oleh Direktur Jenderal ;
  1. Keputusan Direktur Jenderal Mineral dan Batubara Kementerian Energi dan Sumber Daya Mineral Nomor : 195.K/30/DJB/2020 tanggal 8 Juli 2020 Tentang Tata Cara Verifikasi Teknis Kegiatan Pengangkutan Dan Penjualan Mineral Dan Batubara, Lampiran I angka 4 yang berbunyi :
  1. Surveyor :

a.   Melakukan verifikasi teknis kegiatan pengangkutan dan penjualan pada aplikasi Modul Verifikasi Penjualan (MVP) meliputi :

  1. Pemeriksaan dokumen kontrak penjualan dan rencana pengiriman (Shipping Instruction atau Purchase Order) ;
  2. Bukti setor Iuran Produksi/Royalti atau DHPB di muka yang dicetak melalui apalikasi e-PNBP ;
  3. Tanggal pengapalan ;
  4. Kualitas dan kuantitas mineral logam atau batubara ;
  5. Nama pembeli ;
  6. Lokasi pelabuhan muat dan pelabuhan tujuan ;
  7. Lokasi titik serah dan metode penjualan ;
  8. Nama sarana angkutan ;

b.   Menerbitkan LHV pada Aplikasi MVP setelah melakukan verifikasi teknis sebagaimana dimaksud pada huruf a ;

c.   Mengunggah LHV yang telah ditandatangani pada Aplikasi MVP ;

d.   Menginput data kualitas hasil verifikasi penjualan pada Aplikasi MVP ;

e.   Menerbitkan CoW dan CoA atas hasil verifikasi kuantitas dan kualitas yang telah diinput pada Aplikasi MVP ;

f.    Mengunggah CoW dan CoA yang telah ditandatangani pada Aplikasi MVP ;

  1. Keputusan Menteri Energi Dan Sumber Daya Mineral Republik Indonesia Nomor : 228.K/MB.01/MEM.B/2022 tanggal 12 September 2022 Tentang Penetapan PT. Geoservices Sebagai Surveyor Untuk Verifikasi Analisa Kuantitas Dan Kualitas Penjualan Batubara jo Keputusan Direktur Jenderal Mineral Dan Batubara Nomor : 1052.K/30/DJB/2014, tanggal 30 Desember 2014 Diktum Kedua, Ketiga, Keempat yang berbunyi :
  1. Diktum Kedua :
    1. Surveyor sebagaimana dimaksud dalam Diktum Kesatu mempunyai tugas :
  1. Melakukan verifikasi analisa kuantitas batubara di lokasi penambangan, fasilitas penimbunan (stockpile), moda pengangkutan, dan/atau titik penjualan dengan hasil analisa berupa Certificate of Weight (COW) dan/atau Report of Weight ;
  2. Melakukan verifikasi analisa kualitas batubara di lokasi penambangan, fasilitas penimbunan (stockpile), moda pengangkutan, dan/atau titik penjualan dengan hasil analisa berupa Certificate of Analysis (COA) dan/atau Report of Analysis (ROA) ;
  3. Melakukan verifikasi pemenuhan kewajiban pembayaran iuran Produksi/royalti yang dicetak melalui aplikasi elektronik Penerimaan Negara Bukan Pajak (e-PNBP) sesuai dengan ketentuan peraturan perundang-undangan ; dan
  4. Menyampaikan laporan bulanan pelaksanaan verifikasi analisa kuantitas dan kualitas batubara kepada Menteri melali Direktur Jendera Mineral dan Batubara sesuai dengan format tercantum dalam Lampiran I yang merupakan bagian tidak terpisahkan dari Keputusan Menteri ini ;
  1. Diktum Ketiga :

Surveyor bertanggung jawab terhadap hasil analisa berupa Certificate of Weight (COW), Report Of Weight, Certificate of Analysis (COA) dan/atau Report of Analysis (ROA) sebagaimana dimaksud dalam Diktum kedua ;

  1. Diktum Keempat :

VerIfikasi analisa kuantitas dan kualitas penjualan batubara berlaku pada wilayah kerja tercantum dalam lampiraan II yang merupakan bagian tidak terpisahkan dari Keputusan Menteri ini ;

-  Bahwa seluruh pelaksanaan penerimaan batubara termasuk pelaksanaan survey yang dilakukan oleh PT Geoservices untuk penentuan kuantitas dan pengujian kualitas batubara, didampingi dan diawasi oleh PT Haleyora Powerindo guna memastikan prosedur penerimaan, pembongkaran dan pengujian batubara serta verifikasi tagihan telah dilaksanakan sesuai dengan SOP yang berlaku di PT. PJB untuk PLTU Rembang, namun PT. Haleyora Powerindo dalam melakukan pendampingan juga tidak melakukan sesuai dengan SOP yang ada dan menerbitkan Laporan Kegiatan Pendampinggan Penentuan Kuantitas dan Pemeriksaan Kualitas Batubara yang tidak sesuai dengan kondisi yang sebenarnya;

-  Bahwa Certificate of Sampling and Analisys (CoA) tanggal 20 Mei 2022 Cert. No.09722.00113 Shipment No.2888 yang berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya dan CoA tesebut yang ditandatangani oleh Terdakwa selaku Manajer PT. Geoservice Cabang Mojokerto dan Laporan Kegiatan Pendampingan oleh PT. Haleyora Powerindo tersebut kemudian digunakan oleh PT. PLN untuk melakukan pembayaran batubara pengiriman I (pertama) tersebut kepada PT.BIG sebesar Rp. 4.608.284.222,00 (empat miliar enam ratus delapan juta dua ratus delapan puluh empat ribu dua ratus dua puluh dua rupiah/setelah dipotong pajak) yang ditransfer ke rekening PT. Borneo Inter Global (BIG) di Bank BCA dengan nomor rekening 8060 232335 ;

-  Bahwa pada tanggal 6 November 2022 PT. Borneo Inter Global (BIG) melakukan pengiriman/pengapalan II (kedua) Batubara ke PLTU Rembang sebanyak 7.684,070 MT. dengan Tongkang TB. Lautan Berlian 818 / BG. Rezeki Lautan 818.

-  Bahwa untuk pengiriman/pengapalan II (kedua) tersebut REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG menerbitkan Shipping Instuction Nomor : 14/SI/BIG/IX/2022 tanggal 21 Oktober 2022 yang ditujukan kepada :

  1. PT. Berlian Bintang Bahari
  2. PT. Koperasi Lntas Usaha Bartim
  3. Jetty Bangun Nusantara Jaya Makmur (BNJM)
  4. Surveyor PT. Asiatrust Techvima Quality  (ATQ)

Dengan isi yaitu :

  • Nama Tongkang dan Tugboat :  TB Lautan berlian 818 (GT 21) / BG. Rezeki Lautan 818 (GT 3420)
  • Pengirim                                         :  PT. Borneo Inter Global ;
  • Dengan tujuan                              :  PLTU Rembang - Jawa Tengah
  • Rencana Pengapalan                  :  27-29 Oktober 2022
  • Volume                                           :  7.500 MT
  • Jenis Cargo                                    :  Steam Coal ;
  • Pelabuhan Muat                         :  Jetty Bangun Nusantara Jaya Makmur (BNJM) Kalimantan Tengah ;
  • Pelabuhan Bongkar                     :  PLTU Rembang Jawa Tengah ;
  • Surveyor                                         :  PT. Asiatrust Technovima Quality (ATQ)

Untuk menerbitkan :

  1. Bill of Loading (B/L) ;
  2. Certificate of Sampling and Analysis ;
  3. Certificate of Weight ;
  4. Certificate of Origin ;
  5. LHV, RKBM Royalti, Rekom Distamben ;
  6. Surat Keterangan Asal Barang ;
  7. Surat Pengiriman Barang ;

-  Bahwa untuk pengapalan/pengiriman II (kedua) batubara oleh PT. BIG ke PLTU Rembang, KLUB menerbitkan Surat Ketarangan Asal Barang (SKAB) tanggal 3 November 2022 yang menerangkan bahwa batubara yang diangkut dengan Tongkang TB Lautan Berlian 818 / BG. Rezeki Lautan 818 sebanyak 7.684,070 MT berasal dari Lokasi Tambang / IUP OP Desa Kandris Kec. Karusen Janang, Kab. Barito Timur Kalimantan Tengah milik Koperasi Lintas Usaha Bartim ;

-  Bahwa pada saat muat (loading) batubara untuk pengapalan II (kedua) tanggal 29 Oktober 2022 sampai dengan tanggal 03 Nopember 2022 BOGGY LINGGAR YUANGGA selaku selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) yang ditunjuk sebagai Surveyor memerintahkan RIZAL dan NASIR untuk mengambil sample batubara yang akan dikirim oleh PT. BIG ke PLTU Rembang yang berasal dari Koperasi Lintas Usaha Bartim (KLUB) di Pelabuhan Bangun Nusantara Jaya Makmur (BNJM) di Desa Rangga Ilung Kecamatan Jenamas Kab. Barito Timur padahal RIZAL dan NASIR tidak terdaftar sebagai Sampler pada Daftar Petugas Surveyor Mineral dan Batubara Teregistrasi di Direktorat Jenderal Mineral dan Batubara sehingga RIZAL dan NASIR tidak kompeten melakukan pengambilan sample ;

-  Bahwa pengiriman/pengapalan II (kedua) tersebut BOGGY LINGGAR YUANGGA selaku selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) juga tidak melakukan verifikasi teknis kegiatan pengangkutan dan penjualan batubara pada aplikasi Modul Verifikasi Penjualan (MVP) dan tidak menerbitkan LHV namun BOGGY LINGGAR YUANGGA selaku selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) menerbitkan Certificate of Sampling and Analysis (CoA), Certifiacate of Weight (CoW) dan Draught Survey Report (DSR) masing-masing tanggal 06 November 2022 Job. No. : JO.05.22.00307 yang kemudian dipakai oleh REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG sebagai kelengkapan dokumen untuk pengiriman/pengapalan II (kedua) batubara ke PLTU Rembang sebanyak 7.684,070 MT. dengan Tongkang TB. Lautan Berlian 818 / BG. Rezeki Lautan 818 ;

-  Bahwa untuk melengkapi dokumen pengiriman/pengapalan II (kedua) batubara ke PLTU Rembang REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG juga menggunakan Laporan Hasil Verifikasi (LHV) yang diterbitkan oleh PT. Indo Borneo Inspeksi Services (IBIS) No.LHV : 406.02/IBIS-MINERBA/XI/22 tanggal 03 November 2022, dengan demikian yang terverifikasi dalam Aplikasi Modul Verifikasi Penjualan (MVP) adalah CoA dan CoW yang diterbitkan oleh PT. IBIS dan bukan CoA dan CoW yang diterbitkan oleh Terdakwa selaku Surveyor ;

-  Bahwa CoA tanggal 06 November 2022 Job. No. : JO.05.22.00307 yang diterbitkan oleh BOGGY LINGGAR YUANGGA selaku selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) juga berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya yaitu Gross Calorific Value (As Received Basis) 4.224 kcal/kg padahal Gross Calorific Value (As Received Basis) batubara yang berasal dari IUP OP Koperasi Lintas Usaha Bartim (KLUB) berkisar antara 2.700 kcal/kg-3.200 kcal/kg ;

-  Bahwa pengiriman/pengapalan II (kedua) batubara yang dikirim oleh PT. BIG ke PLTU Rembang sebanyak 7.684,070 MT tiba di PLTU Rembang pada tanggal 10 November 2022 dan dilakukan pembongkaran pada tanggal 13 s/d 15 November 2022, dan sesuai Log Book Activity Of Barge Inspector (Time Sheet) tanggal 15 November 2022 yang dibuat oleh Surveyor PT. Geoservices terdapat beberapa kegiatan yang berhenti (Stopped) atau tertunda (delayed), yaitu :

  • Date Nov 13,2022.
  • Time 09.35-11.20 Stop Disch, Bad Weather and Cleaning Hoper (SU)
  • Time 13.00-14.30 Stop Disch, Wet cargo realization and cleaning JT04 SR
  • Time 15.00-17.15 Stop Disch, Wet cargo realization and cleaning JT04 Hoper SU
  • Time 17.25-20.50 Stop Disch, Wet cargo realization and cleaning JT01,JT02 SR
  • Time 21.00-21.55 Stop Disch, Wet cargo realization and cleaning JT02, JT04 SR
  • Date Nov 14, 2022.
  • Time 02.00-04.40 Stop Disch, Wet cargo realization and cleaning JT02, JT04 SR
  • Time 07.00-08.00 Stop Disch, Wet cargo realization and cleaning JT01, Hoper SU
  • Time 12.00-13.30 Stop Disch, Wet Cargo Realization and Cleaning Hoper SU
  • Time 15.30-17.00 Stop Disch, Bad Weather
  • Time 17.05-18.25 Stop Disch, Equipment Failure (MD BC 02)
  • Date Nov 15, 2022
  • Time 00.30-01.00 Stop Disch, Wet cargo realization and cleaning JT04 SR
  • Time 07.00-08.20 Stop Disch, Wet cargo realization and cleaning JT01 Hoper SU
  • Time 10.00-10.10 Wheel Loader Transfer to Barge for Cleaning
  • Time 12.30-12.40 Wheel Loader Out From Barge.

-  Bahwa berdasarkan catatan tersebut terdapat 12 kali kegiatan pembongkaran terhenti dimana 2 kali disebabkan cuaca buruk, 1 kali karena adanya kerusakan alat dan 9 kali karena kondisi batubara basah yang menyebabkan plugging dan harus dilakukan pembersihan jalur pembongkaran ;

-  Bahwa kondisi yang terjadi pada saat dilakukan pembongkaran batubara tersebut menunjukkan indikasi kadar kalori batubara yang dikirim oleh PT. BIG ke PLTU Rembang pada pengiriman/pengapalan II (kedua) juga benilai rendah ;

-  Bahwa untuk penentuan kuantitas dan pemeriksaan kualitas batubara pengiriman II (kedua) oleh PT. BIG ke PLTU Rembang tersebut dilakukan oleh PT. Geoservices Cabang Mojokerto ;

-  Bahwa Terdakwa selaku Manajer PT. Geoservices Cabang Mojokerto yang ditugaskan untuk melakukan penentuan kuantitas dan pemeriksaan kualitas batubara pengiriman II (kedua) oleh PT. BIG ke PLTU Rembang tersebut kemudian menerbitkan Certificate of Sampling and Analisys (CoA) tanggal 20 November 2022 Cert. No.09722.00209 Shipment No.2984 yang berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya dan CoA tesebut kemudian ditandatangani oleh Terdakwa ;

-  Bahwa seluruh pelaksanaan penerimaan batubara termasuk pelaksanaan survey yang dilakukan oleh PT Geoservices untuk penentuan kuantitas dan pengujian kualitas batubara, didampingi dan diawasi oleh PT Haleyora Powerindo guna memastikan prosedur penerimaan, pembongkaran dan pengujian batubara serta verifikasi tagihan telah dilaksanakan sesuai dengan SOP yang berlaku di PT. PJB untuk PLTU Rembang, namun PT. Haleyora Powerindo dalam melakukan pendampingan juga tidak melakukan sesuai dengan SOP yang ada dan menerbitkan Laporan Kegiatan Pendampinggan Penentuan Kuantitas dan Pemeriksaan Kualitas Batubara yang tidak sesuai dengan kondisi yang sebenarnya ;

-  Bahwa Certificate of Sampling and Analisys (CoA) tanggal 20 November 2022 Cert. No.09722.00209 Shipment No.2984 yang berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya yang ditandatangani oleh Terdakwa selaku Manajer PT. Geoservice Cabang Mojokerto dan Laporan Pendampingan oleh PT. Haleyora Powerindo tersebut kemudian digunakan oleh PT. PLN untuk melakukan pembayaran batubara pengiriman II (kedua) tersebut kepada PT. BIG sebesar Rp.5.301.390.956,00 (lima miliar tiga ratus satu juta tiga ratus sembilan puluh ribu sembilan ratus lima puluh enam rupiah/setelah dipotong pajak) yang ditransfer ke rekening PT. Borneo Inter Global (BIG) di Bank BCA dengan nomor rekening 8060 232335 ;

  • Bahwa berdasarkan CoA yang diterbitkan oleh PT. IBIS Spesifikasi Kalori (GAR) Batubara yang dikirim oleh PT. Borneo Inter Global (BIG) ke PLTU Rembang tahap I (pertama) adalah 3660 Kcal/Kg dengan CoA Nomor : 135/SUPT/IBIS-BJB/IV/2022 tanggal 24 April 2022 sedangkan untuk tahap II (kedua) adalah 2917 Kcal/Kg dengan CoA Nomor : 496/SUPT/IBIS-BJB/XI/2022 tanggal 6 November 2022 ;

-  Bahwa berdasarkan hasil pengujian sample Batubara yang diambil dari lokasi penambangan PT. Kalinapu Bartim di KLUB, yang pengujiannya dilakukan oleh PT. Sucofindo Indonesia Cabang Banjarmasin diperoleh spesifikasi Kalori (GAR) adalah 2.600-2.700 Kcal/Kg.

-  Bahwa perbuatan Terdakwa Tommy Firmansyah tersebut, telah memperkaya diri sendiri terdakwa atau orang lain atau suatu koorporasi yatitu saksi Rezky Rumbogo Heryanto selaku Direktur Utama PT BIG sebesar Rp. 4.354.422.769,- (empat milyar tiga ratus lima puluh empat juta empat ratus dua puluh dua ribu tujuh ratus enam puluh sembilan rupiah), saksi David Pangihutan Hutauruk sebesar total Rp. 375.000.000,- (tiga ratus tujuh puluh lima juta rupiah) dan saksi Ferial Mukhyar alias ibu Evi Rp. 256.000.000,- (dua ratus lima puluh enam juta rupiah) atau setidak-tidaknya sejumah tersebut ;

-  Bahwa akibat perbuatan Terdakwa Tommy Firmansyah tersebut telah menimbulkan kerugian keuangan negara sebesar Rp. 4.985.422.769,00 (empat milyar sembilan ratus delapan puluh lima juta empat ratus dua puluh dua ribu tujuh ratus enam puluh sembilan rupiah) sebagaimana Laporan Hasil Audit Penghitungan Kerugian Keuangan Negara Dalam Perkara Dugaan Tindak Pidana Korupsi Dalam Pengadaan Bahan Bakar Batubara untuk PT PLN (Persero) Yang Berasal Dari Wilayah Penambangan Kalimantan Tengah Tahun 2022 Nomor PE.03.03/LHP-591/PW15/5/2023 tanggal 27 Desember 2023 yang diterbitkan oleh BPKP Perwakilan Kalimantan Tengah ;----------------------------------------------------------

 

--------  Perbuatan Terdakwa sebagaimana diatur dan diancam pidana dalam Pasal 2 ayat (1) jo Pasal 18 Undang-Undang Nomor 31 Tahun 1999 tentang Pemberantasan Tindak Pidana Korupsi sebagaimana telah diubah dengan Undang-UndangNomor 20 Tahun 2001 tentang Perubahan atas Undang-Undang Nomor 31 Tahun 1999 Tentang Pemberantasan Tindak Pidana Korupsi jo Pasal 55 ayat (1) ke-1 KUHPidana;------------------------------------------------------------------------------------------------

 

SUBSIDIAIR:

 

--------  Bahwa Terdakwa TOMMY FIRMANSYAH selaku Manager PT. Geoservices Cabang Mojokerto dalam kedudukannya sebagai surveyor bongkar berdasarkan Perjanjian Tentang Pekerjaan Jasa Survey Analisa Kuantitas dan Kualitas batubara Yang Diangkut Dengan Tongkang/Kapal Untuk PLTU Rembang No. Pembangkitan Jawa-Bali : 011.PJ/061/2021 No. PT. Geoservices : 321.GS/SK/2021 tanggal 29 Maret 2021 antara PT. Pembangkitan Jawa Bali (PJB) dan PT. Geoservices, sebagai yang melakukan atau turut serta melakukan bersama-sama dengan saksi REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global (dilakukan penuntutan secara terpisah), pada hari Jumat tanggal 20 Mei 2022 dan hari Minggu tanggal 20 Nopember 2022 atau setidak-tidaknya pada waktu lain dalam bulan Mei 2022 dan bulan Nopember 2022 atau setidak-tidaknya dalam tahun 2022 bertempat di Kantor Cabang PT. Geoservices di Mojokerto di Jalan Empu Nala Mojokerto, atau setidak-tidaknya di suatu tempat tertentu yang berdasarkan Pasal 84 ayat (2) KUHAP Pengadilan Tindak Pidana Korupsi pada Pengadilan Negeri Palangka Raya berwenang memeriksa dan mengadili perkara ini berdasarkan ketentuan Pasal 35 ayat (2) Undang-undang Nomor : 46 tahun 2009 tentang Pengadilan Tindak Pidana Korupsi dengan tujuan menguntungkan diri sendiri atau orang lain atau suatu korporasi yaitu REZKY RUMBOGO HERYANTO selaku Direktur PT. Borneo Inter Global (BIG) sebesar Rp.4.985.422.769,00 (empat milyar sembilan ratus delapan puluh lima juta empat ratus dua puluh dua ribu tujuh ratus enam puluh sembilan rupiah) menyalahgunakan kewenangan, kesempatan, atau sarana yang ada padanya karena jabatan atau kedudukan, telah melakukan perbuatan yaitu dalam melaksanakan tugasnya melakukan penentuan kuantitas dan pemeriksaan kualitas batubara yang dikirim oleh PT. Borneo Inter Global (selanjutnya disebut PT. BIG) ke PLTU Rembang dengan menerbitkan Certificate of Sampling and Analysis (CoA) yang berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya,  yaitu CoA tanggal 20 Mei 2022 Cert. No.09722.00113 Shipment No.2888 dan CoA tanggal 20 November 2022 Cert. No.09722.00209 Shipment No.2984, yang keduanya ditandatangani oleh Terdakwa, sehingga bertentangan dengan Peraturan Menteri ESDM No. 26 Tahun 2018 Tentang Pelaksanaan Kaidah Pertambangan Yang Baik dan Pengawasan Pertambangan Minerel Dan Batubara Pasal 30 ayat (1) dan (2), Keputusan Direktur Jenderal Mineral dan Batubara Kementerian Energi dan Sumber Daya Mineral Nomor : 195.K/30/DJB/2020 tanggal 8 Juli 2020 Tentang Tata Cara Verifikasi Teknis Kegiatan Pengangkutan Dan Penjualan Mineral Dan Batubara, Lampiran I angka 4, dan Keputusan Menteri Energi Dan Sumber Daya Mineral Republik Indonesia Nomor : 228.K/MB.01/MEM.B/2022 tanggal 12 September 2022 Tentang Penetapan PT. Geoservices Sebagai Surveyor Untuk Verifikasi Analisa Kuantitas Dan Kualitas Penjualan Batubara jo Keputusan Direktur Jenderal Mineral Dan Batubara Nomor : 1052.K/30/DJB/ 2014 tanggal 30 Desember 2014 serta Perjanjian Tentang Pekerjaan Jasa Survey Analisa Kuantitas dan Kualitas batubara Yang Diangkut Dengan Tongkang/Kapal Untuk PLTU Rembang No. Pembangkitan Jawa-Bali : 011.PJ/061/2021 No. PT. Geoservices : 321.GS/SK/2021 tanggal 29 Maret 2021 antara PT. Pembangkitan Jawa Bali (PJB) dan PT. Geoservices, Pasal 2 angka 11 huruf a angka 2 dalam pengadaan batubara oleh PT. BIG Ke PLTU Rembang, yang dapat merugikan keuangan negara atau perekonomian negara sebesar Rp.4.985.422.769,00 (empat milyar sembilan ratus delapan puluh lima juta empat ratus dua puluh dua ribu tujuh ratus enam puluh sembilan rupiah) yang dilakukan oleh Terdakwa dengan cara sebagai berikut :

-  Bahwa pada tanggal 21 Januari 2022 PT. PLN (Persero) menunjuk REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global (BIG) untuk penanganan keadaan darurat (emergency) pasokan batubara PLTU PT. PLN (Persero) dengan Surat Nomor : 4824/EPI.01.01/C01050200/2022-R untuk melaksanakan pasokan batubara dengan volume sebesar 15.000 MT (opsi swing + 30%) dengan  jangka waktu kontrak sampai dengan 31 Januari 2022, dengan rencana pasokan batubara sebagai berikut :

  • Pengapalan Pertama :

-  Sumber tambang :  Koperasi Lintas Usaha Bartim ;

-  Jetty Loading         :  Jetty Bangun Nusantara Jaya Makmur ;

-  Tanggal loading    :  27-28 Januari 2022 ;

-  ETA                         :  6 Februari 2022 ;

-  Tujuan                     :  PLTU Rembang ;

-  Volume Muat         :  7500 MT ; dan

  • Pengapalan Kedua :

-  Sumber tambang  :  Koperasi Lintas Usaha Bartim ;

-  Jetty Loading         :  Jetty Bangun Nusantara Jaya Makmur ;

-  Tanggal loading    :  29-30 Januari 2022 ;

-  ETA                         :  8 Februari 2022 ;

-  Tujuan                    :  PLTU Rembang ;

-  Volume Muat         :  7500 MT ; dan

  • Spesifikasi batubara sebagai berikut :

-  Gross Calorie Value (ar, Kcal/Kg)    :  4200, batas penolakan :  < 4000>

-  Total Moisture (ar %)                          :  32,00 batas penolakan :  >38,00

-  Total Sulphur (ar %)                           :  0,57, batas penolakan  :  > 0,80

-  Ash (ar %)                                            :  4,86, batas penolakan  :  > 7

-  Hardgrove Grindability Index (HGI)  :  45, batas penolakan     :  < 43> 65

-  Bahwa pada tanggal 12 Maret 2022 saksi REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global (BIG) menerbitkan Shipping Instruction Nomor : 07/SI/BIG-LMN/III/2022 yang ditujukan kepada :

  1. PT. Kalinapu Barito Timur
  2. Koperasi Lntas Usaha Bartim
  3. Jetty Bangun Nusantara Jaya Makmur
  4. Surveyor Asiatrust Techvima Quality  (ATQ)

Dengan isi yaitu :

  • Nama Tongkang dan Tugboat :  TB LUMENA 06  (GT 204) / BG. APC 18 (GT 3143)
  • Pengirim                                       :  PT. Borneo Inter Global ;
  • Dengan tujuan                            :  PLTU Rembang - jawa Tengah
  • Rencana Pengapalan                :  15-16 Maret 2022
  • Volume                                         :  7.500 MT
  • Jenis Cargo                                 :  Batubara ;
  • Pelabuhan Muat                         :  Jetty Bangun Nusantara Jaya Makmur (BNJM) Kalimantan Tengah ;
  • Pelabuhan Bongkar                   :  PLTU Rembang Jawa Tengah ;
  • Surveyor                                       :  PT. Asiatrust Technovima Quality (ATQ)

Untuk menerbitkan :

  1. Bill of Loading (B/L) ;
  2. Certificate of Sampling and Analysis
  3. Certificate of Weight ;
  4. Certificate of Origin
  5. LHV, RKBM Royalti, Rekom Distamben
  6. Surat Keterangan Asal Barang ;
  7. Surat Pengiriman Barang

-  Bahwa untuk pengiriman/pengapalan I (pertama) batubara oleh PT. BIG ke PLTU Rembang, Koperasi Lintas Usaha Bartim (KLUB) menerbitkan Surat Keterangan Asal Barang (SKAB) tanggal 22 April 2022 yang menerangkan bahwa batubara yang diangkut dengan Tongkang TB LUMENA 06  (GT 204) / BG. APC 18 (GT 3143) sebanyak 7.560,684 MT berasal dari Lokasi Tambang/IUP OP Desa Kandris Kec. Karusen Janang, Kab. Barito Timur Kalimantan Tengah milik Koperasi Lintas Usaha Bartim ;

-  Bahwa Koperasi Lintas Usaha Bartim (KLUB) merupakan Badan Usaha pemegang Izin Usaha Pertambangan Operasi Produksi (IUP OP) Nomor 384 Tahun 2014 tanggal 04 Desember 2014;

-  Bahwa berdasarkan Rencana Kerja Dan Anggaran Biaya (RKAB) KLUB tahun 2021 sampai dengan tahun 2022 kualitas siap jual batubara yaitu :

  • CV    : 2.700 s/d 3.200 Kcal/Kg gar
  • TM    : 48-56 % gar
  • IM      : 12-13 ?b
  • TS     : 0,7-0,88 % gar
  • Ash   : 4-8% gar

-  Bahwa sebelum pengapalan I (pertama) batubara yang akan dikirim ke PLTU Rembang, REZKY RUMBOGO HERYANTO menghubungi DAVID PANGIHUTAN HUTAURUK dan meminta supaya mengkondisikan pemeriksaan kualitas batubara kepada Surveyor muat agar sesuai dengan kualitas yang diminta oleh PT. PLN (Persero) dan untuk itu REZKI RUMBOGO HERYANTO memberikan biaya/fee sebesar Rp.26.000,- per MT dengan rincian Rp.25.000,- untuk surveyor muat maupun bongkar dan Rp.1.000,- untuk saksi David Pangihutan Hutauruk, kesepakatan tersebut direalisasikan oleh saksi Rezky Rumbogo Heryanto  dengan mentrasfer uang ke saksi David Pangihutan Hutauruk sebesar total Rp. 375.000.000,- ;

-  Bahwa pada saat muat (loading) batubara untuk pengapalan I (pertama) tanggal 19 Maret 2022 sampai dengan tanggal 21 April 2022 BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) memerintahkan RIZKY, RIZALI dan HAMDANI untuk mengambil sample batubara yang akan dikirim oleh PT. BIG ke PLTU Rembang yang berasal dari Koperasi Lintas Usaha Bartim (KLUB) di Pelabuhan Bangun Nusantara Jaya Makmur (BNJM) di Desa Rangga Ilung Kecamatan Jenamas Kab. Barito Timur padahal RIZKY, RIZALI dan HAMDANI tidak terdaftar sebagai Sampler pada Daftar Petugas Surveyor Mineral dan Batubara Teregistrasi di Direktorat Jenderal Mineral dan Batubara sehingga RIZKY, RIZALI dan HAMDANI tidak kompeten melakukan pengambilan sample;

-  Bahwa BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) kemudian dihubungi oleh DAVID PANGIHUTAN HUTAURUK melalui WA untuk menerbitkan Certificate of Sampling and Analysis (CoA), Certificate of Weight (CoW) dan Draught Survey Report (DSR) saja tidak perlu menerbitkan Laporan Hasil Verifikasi (LHV) ;

-  Bahwa atas permintaan dari DAVID PANGIHUTAN HUTAURUK tersebut maka untuk pengapalan I (pertama) batubara yang akan dikirim oleh PT. BIG ke PLTU Rembang BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) tidak menerbitkan Laporan Hasil Verifikasi (LHV) karena tidak melakukan verifikasi teknis kegiatan pengangkutan dan penjualan batubara pada aplikasi Modul Verifikasi Penjualan (MVP) namun BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) menerbitkan Certificate of Sampling and Analysis (CoA) dan Certificate of Weight (CoW) dan Draught Survey Report (DSR) masing-masing tanggal 25 April 2022 Nomor : 05.22.0053 dimana CoA yang diterbitkan berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya. Dokumen  tersebut dipakai oleh REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG sebagai kelengkapan dokumen untuk pengiriman/pengapalan I (pertama) batubara ke PLTU Rembang sebanyak 7.560,684 MT dengan menggunakan Tongkang/Tugboat : TB Lumena 06 /BG.APC 18;

-  Bahwa untuk melengkapi dokumen pengiriman/pengapalan I (pertama) batubara ke PLTU Rembang sebanyak 7.560,684 MT dengan menggunakan Tongkang/Tugboat : TB Lumena 06 /BG.APC 18 tersebut, REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG menggunakan Laporan Hasil Verifikasi (LHV) yang diterbitkan oleh PT. Indo Borneo Inspeksi Services (IBIS) No.LHV : 097/02/IBIS-MINERBA/IV/22 tanggal 23 April 2022, dengan demikian yang terverifikasi dalam Aplikasi Modul Verifikasi Penjualan (MVP) adalah CoA dan CoW yang diterbitkan oleh PT. IBIS dan bukan CoA dan CoW yang diterbitkan oleh PT. ATQ selaku Surveyor ;

-  Bahwa CoA tanggal 25 April 2022 Nomor : 05.22.0053 yang diterbitkan oleh BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) juga berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya yaitu Gross Calorific Value (As Received Basis) 4.243 kcal/kg padahal Gross Calorific Value (As Received Basis) batubara yang berasal dari IUP OP Koperasi Lintas Usaha Bartim (KLUB) berkisar antara 2.700 kcal/kg s/d 3.200 kcal/kg ;

-  Bahwa REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG juga menggunakan CoA dan CoW masing-masing tanggal 25 April 2022 Nomor : 05.22.0053 yang diterbitkan oleh BOGGY LINGGAR YUANGGA selaku Manajer Area Kalimantan Selatan dan Kalimantan Tengah PT. Asiatrust Technovima Quality (ATQ) untuk melengkapi persyaratan untuk bisa berkontrak dengan PT. PLN (Persero) untuk pengadaan batubara dalam keadaan darurat (emergency) dan dengan adanya CoA yang diterbitkan oleh Terdakwa tersebut yang berisi data bahwa Gross Calorific Value batubara yang berasal dari IUP OP KLUB adalah 4.243 kcal/kg sehingga memenuhi spesifikasi yang ditentukan oleh PT. PLN (Persero) dan juga sesuai dengan penawaran yang diajukan oleh PT. BIG serta sesuai juga dengan hasil rapat antara PT. PLN (Persero) dengan PT. BIG melalui Video Conference yang menyepakati spesifikasi batubara yang akan dipasok oleh PT. BIG ke PLTU Rembang adalah pada kalori 4.200 kcal/kg, kemudian PT. PLN (Persero) dan PT. Borneo Inter Global membuat Perjanjian Jual Beli Batubara (PJBB) Nomor PLN : 0243.Pj/EPI.01.01/C01050200/2022, Nomor Pemasok : - tanggal 26 April 2022 yang ditandatangani oleh Executive Vice Presiden Batu Bara PT. PLN (Persero) dengan REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global, yang isinya antara lain :

  • Spesifikasi :
  1. Batubara yang dijual berdasarkan PJBB ini wajib memiliki spesifikasi tipikal sebagaimana dimaksud dalam Lampiran I PJBB ini ;
  2. Pemasok wajib menyerahkan batubara homogen, dan menjamin tidak mengandung bahan-bahan logam/magnetis, kotoran-kotoran serta bahan-bahan non logam lainnya dan menjamin batubara yang dikirim memenuhi semua spek legal yang ditetapkan oleh Pemerintah serta menjamin kondisi batubara di dalam kapal tongkang/vessel tidak terpadatkan, tidak berdebu, tidak lengket, dan mudah untuk dibongkar. Untuk menjamin agar batubara tidak berdebu saat dibongkar di pelabuhan bongkar, apabila diperlukan maka pemasok akan melakukan injeksi bahan kimia pada saat batubara dimuat di pelabuhan muat.
  3. Pemasok dilarang menggunakan bahan-bahan kimiawi untuk dicampurkan pada batubara guna merubah kualitas batubara. Apabila ditemukan adanya pencampuran bahan-bahan kimiawi tersebut :
  1. PLN berhak melakukan penolakan pembayaran batubara dalam hal batubara belum dibayar oleh PLN ; atau
  2. Pemasok akan membayar ganti rugi kepada PLN dalam hal batubara telah dibayar oleh PLN sebagaimana diatur dalam Pasal 29 PJBB ini ;
  • Penurunan harga atas batubara yang tidak sesuai.

Apabila PLN memutuskan untuk tetap menerima batubara yang tidak sesuai sebagaimana dimaksud dalam Pasal 9.3.1.3, maka harga FOB Tongkang/Vessel bulanan (Pfobm) atas batubara yang tidak sesuai harus dikenakan penyesuaian harga sesuai Pasal 7.1 dan selanjutnya dikenakan penurunan harga berdasarkan ketentuan sebagai berikut :

  1. Tabel Penurunan Harga atas Batubara Yang Tidak Sesuai I.
  1. Nilai Kalori kcal/Kg (ar) :
    • batas penolakan : <3>
    • penurunan harga : 50%
  1. Tabel Penurunan Harga atas Batubara Yang Tidak Sesuai II.
  1. Nilai Kalori kcal/Kg (ar) :
    • batas penolakan : <4>
    • penurunan harga : 10%
  2. Total Moisture (ar) :
    • batas penolakan : > 38
    • penurunan harga : 5%
  3. Sulphur (ar) :
    • batas penolakan : > 0,8
    • penurunan harga : 5%
  4. Ash (ar) :
    • batas penolakan : >7
    • penurunan harga : 5%
  5. Hardgrove Grindability Index :
    • batas penolakan : < 43> 65
    • penurunan harga : 5%

-  Bahwa selain spesifikasi batubara yang disekapati dalam Perjanjian Jual Beli Batubara, disepakati pula batubara yang dikirim ke PLTU Rembang semuanya sudah dalam bentuk Crushing Coal (sudah dihancurkan) sebagaimana spesifikasi teknis yang tercantum dalam KAK dengan sizing (ukuran) kurang dari (<) 50 mm;

-  Bahwa REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. Borneo Inter Global ternyata mengirimkan batubara yang sebagian masih dalam bentuk bongkahan (raw coal) sehingga tidak sesuai dengan kesepakatan yang dibuat ;

-  Bahwa proses muat batubara ke atas tongkang di Pelabuhan (Jetty) BNJM dilakukan dengan menggunakan dump truck (trucking) tidak menggunakan compeyor, oleh karena batubara yang akan dimuat ke tongkang sebagian besar masih berbentuk bongkahan (raw coal) sehingga apabila dimuat menggunakan compeyor akan merusak compeyor, kecuali lapisan teratas dimuat secara curah menggunakan compeyor karena batubaranya sudah dicrusher dengan tujuan pada saat dilakukan checking visual di pelabuhan bongkar terlihat seolah-olah batubara yang dimuat semuanya sudah dicrushing dan dimuat secara curah;

-  Bahwa untuk pengiriman/pengapalan batubara ke PLTU Rembang PT. PLN (Persero) melalui Unit Bisnisnya yaitu PT. Pembangkitan Jawa Bali (PJB) menunjuk :

1.   PT. Geoservies sebagai Surveyor Bongkar berdasarkan Perjanjian Tentang Pekerjaan Jasa Survey Analisa Kuantitas dan Kualitas Batubara Yang Diangkut Dengan Tongkang/Kapal Untuk PLTU Rembang No. Pembangkitan Jawa-Bali : 011.PJ/061/2021, No. PT. Geoservices : 421.GS/SK/2021 tanggal 29 Maret 2021 ; dan

2.   PT. Haleyora Powerindo selaku Penyedia Jasa Supervisi Penentuan Kuantitas dan Pemeriksaan Kualitas serta Verifikasi Tagihan Batubara berdasarkan Perjanjian Tentang Pengadaan Pekerjaan Jasa Supervisi Penentuan Kuantitas dan Kualitas Batubara (Pendampingan) dan Verifikasi Tagihan Batubara UBJ O&M Tahun 2022 Nomor PT. Pembangkitan Jawa Bali : 083.PJ/061/2021, Nomor PT. Haleyora Powerindo : 0001.PJ/613/HPI/XII/2021, tanggal 30 Desember 2021 ;

-  Bahwa pengiriman/pengapalan I (pertama) batubara yang dikirim oleh PT. BIG ke PLTU Rembang sebanyak 7.560.684 MT tiba di PLTU Rembang pada tanggal 3 Mei 2022 dan dilakukan pembongkaran pada tanggal 15 Mei 2022, dan sesuai Log Book Activity Of Barge Inspector (Time Sheet) tanggal 15 Mei 2022 yang dibuat oleh Surveyor PT. Geoservices terdapat beberapa kegiatan yang berhenti (Stopped) atau tertunda (delayed), yaitu :

  • Date May 14,2022.
  • Time 21.30-03.20 No Activity, Treatment for Sef Combution Cargo ;
  • Date May 15, 2022.
  • Time 09.00-09.30 Stop Disch, Wet cargo realization and cleaning JT02;
  • Time 10.50-11.10 Stop Disch, Wet cargo realization and cleaning JT02;
  • Time 13.25-13.45 Stop Disch, Wet cargo realization and Cleaning JT01;
  • Time 15.30-15.55 Stop Disch, Wet cargo realization and cleaning JT02;
  • Time 17.00-17.25 Stop Disch, Wet cargo realization and cleaning JT02;
  • Time 17.30-17.40 Wheel Loader transfer to Barge for cleaning ;
  • Time 19.30-19.40 Wheel Loader out from Barge ;
  • Bahwa berdasarkan catatan tersebut telah terbakarnya batu bara diatas tongkang dan terjadi 5 kali kegiatan pembongkaran terhenti harus dilakukan pembersihan jalur pembongkaran;

-  Bahwa kondisi yang terjadi pada saat dilakukan pembongkaran batubara tersebut menunjukkan indikasi kadar kalori batubara yang dikirim oleh PT. BIG ke PLTU Rembang pada pengiriman/pengapalan I (Pertama) benilai rendah ;

-  Bahwa Terdakwa selaku Manajer PT. Geoservices Cabang Mojokerto yang ditugaskan untuk melakukan penentuan kuantitas dan analisa kualitas batubara yang dikirim oleh PT. BIG ke PLTU Rembang tersebut kemudian menerbitkan Certificate of Sampling and Analisys (CoA) tanggal 20 Mei 2022 Cert. No.09722.00113 Shipment No.2888 yang berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya dan CoA tesebut kemudian ditandatangani oleh Terdakwa ;

-  Bahwa perbuatan Terdakwa tersebut bertentangan dengan :

  1. Peraturan Menteri ESDM No.26 Tahun 2018 Tentang Pelaksanaan Kaidah Pertambangan Yang Baik dan Pengawasan Pertambangan Minrel Dan Batubara Pasal 30 ayat (1) dan (2) yang berbunyi :
  • Pasal 30 ayat (1) huruf a :
  1. Pelaksanaan kegiatan penjualan mineral dan batubara sesuai dengan kualitas dan kuantitasnya yang telah disetujui didalam RKAB Tahunan ;
  • Pasal 30 ayat (2) :
  1. Kualitas dan Kuantitas mineral atau batubara sebagaimana dimaksud dalam ayat 1 huruf a yang akan dijual di dalam negeri wajib diverifikasi oleh Surveyor Pelaksana yang ditetapkan oleh Direktur Jenderal ;
  1. Keputusan Direktur Jenderal Mineral dan Batubara Kementerian Energi dan Sumber Daya Mineral Nomor : 195.K/30/DJB/2020 tanggal 8 Juli 2020 Tentang Tata Cara Verifikasi Teknis Kegiatan Pengangkutan Dan Penjualan Mineral Dan Batubara, Lampiran I angka 4 yang berbunyi :
  1. Surveyor :

a.   Melakukan verifikasi teknis kegiatan pengangkutan dan penjualan pada aplikasi Modul Verifikasi Penjualan (MVP) meliputi :

  1. Pemeriksaan dokumen kontrak penjualan dan rencana pengiriman (Shipping Instruction atau Purchase Order) ;
  2. Bukti setor Iuran Produksi/Royalti atau DHPB di muka yang dicetak melalui apalikasi e-PNBP ;
  3. Tanggal pengapalan ;
  4. Kualitas dan kuantitas mineral logam atau batubara ;
  5. Nama pembeli ;
  6. Lokasi pelabuhan muat dan pelabuhan tujuan ;
  7. Lokasi titik serah dan metode penjualan ;
  8. Nama sarana angkutan ;

b.   Menerbitkan LHV pada Aplikasi MVP setelah melakukan verifikasi teknis sebagaimana dimaksud pada huruf a ;

c.   Mengunggah LHV yang telah ditandatangani pada Aplikasi MVP ;

d.   Menginput data kualitas hasil verifikasi penjualan pada Aplikasi MVP ;

e.   Menerbitkan CoW dan CoA atas hasil verifikasi kuantitas dan kualitas yang telah diinput pada Aplikasi MVP ;

f.    Mengunggah CoW dan CoA yang telah ditandatangani pada Aplikasi MVP ;

  1. Keputusan Menteri Energi Dan Sumber Daya Mineral Republik Indonesia Nomor : 228.K/MB.01/MEM.B/2022 tanggal 12 September 2022 Tentang Penetapan PT. Geoservices Sebagai Surveyor Untuk Verifikasi Analisa Kuantitas Dan Kualitas Penjualan Batubara jo Keputusan Direktur Jenderal Mineral Dan Batubara Nomor : 1052.K/30/DJB/2014 30 Desember 2014, Diktum Kedua, Ketiga, Keempat yang berbunyi :
  1. Diktum Kedua :
    1. Surveyor sebagaimana dimaksud dalam Diktum Kesatu mempunyai tugas :
  1. Melakukan verifikasi analisa kuantitas batubara di lokasi penambangan, fasilitas penimbunan (stocpile), moda pengangkutan, dan/atau titik penjualan dengan hasil analisa berupa Certificate of Weight (COW) dan/atau Report of Weight ;
  2. Melakukan verifikasi analisa kualitas batubara di lokasi penambangan, fasilitas penimbunan (stocpile), moda pengangkutan, dan/atau titik penjualan dengan hasil analisa berupa Certificate of Analysis (COA) dan/atau Report of Analysis (ROA) ;
  3. Melakukan verifikasi pemenuhan kewajiban pembayaran iuran Produksi/royalti yang dicetak melalui aplikasi elektronik Penerimaan Negara Bukan Pajak (e-PNBP) sesuai dengan ketentuan peraturan perundang-undangan ; dan
  4. Menyampaikan laporan bulanan pelaksanaan verifikasi analisa kuantitas dan kualitas batubara kepada Menteri melali Direktur Jendera Mineral dan Batubara sesuai dengan format tercantum dalam Lampiran I yang merupakan bagian tidak terpisahkan dari Keputusan Menteri ini ;
  1. Diktum Ketiga :

Surveyor bertanggung jawab terhadap hasil analisa berupa Certificate of Weight (COW), Report Of Weight, Certificate of Analysis (COA) dan/atau Report of Analysis (ROA) sebagaimana dimaksud dalam Diktum kedua ;

  1. Diktum Keempat :

VerIfikasi analisa kuantitas dan kualitas penjualan batubara berlaku pada wilayah kerja tercantum dalam lampiraan II yang merupakan bagian tidak terpisahkan dari Keputusan Menteri ini ;

-  Bahwa seluruh pelaksanaan penerimaan batubara termasuk pelaksanaan survey yang dilakukan oleh PT Geoservices untuk penentuan kuantitas dan pemeriksaan kualitas batubara, didampingi dan diawasi oleh PT Haleyora Powerindo guna memastikan prosedur penerimaan, pembongkaran dan pengujian batubara serta verifikasi tagihan telah dilaksanakan sesuai dengan SOP yang berlaku di PT. PJB untuk PLTU Rembang, namun PT. Haleyora Powerindo dalam melakukan pendampingan juga tidak melakukan sesuai dengan SOP yang ada dan menerbitkan Laporan Kegiatan Pendampinggan Penentuan Kuantitas dan Pemeriksaan Kualitas Batubara yang tidak sesuai dengan kondisi yang sebenarnya;

-  Bahwa Certificate of Sampling and Analisys (CoA) tanggal 20 Mei 2022 Cert. No.09722.00113 Shipment No.2888 yang berisi nilai kalori batubara yang tidak sesuai dengan nilai kalori batubara yang sebenarnya yang ditandatangani oleh Terdakwa selaku Manajer PT. Geoservice Cabang Mojokerto dan Laporan Kegiatan Pendampingan oleh PT. Haleyora Powerindo tersebut kemudian digunakan oleh PT. PLN untuk melakukan pembayaran batubara pengiriman I (pertama) tersebut kepada PT.BIG sebesar Rp.4.608.284.222,00 (empat miliar enam ratus delapan juta dua ratus delapan puluh empat ribu dua ratus dua puluh dua rupiah/setelah dipotong pajak) yang ditransfer ke rekening PT. Borneo Inter Global (BIG) di Bank BCA dengan nomor rekening 8060 232335 ;

-  Bahwa pada tanggal 6 November 2022 PT. Borneo Inter Global (BIG) melakukan pengiriman/pengapalan II (kedua) Batubara ke PLTU Rembang sebanyak 7.684,070 MT. dengan Tongkang TB. Lautan Berlian 818 / BG. Rezeki Lautan 818.

-  Bahwa untuk pengiriman/pengapalan II (kedua) tersebut REZKY RUMBOGO HERYANTO selaku Direktur Utama PT. BIG menerbitkan Shipping Instuction Nomor : 14/SI/BIG/IX/2022 tanggal 21 Oktober 2022 yang ditujukan kepada :

  1. PT. Berlian Bintang Bahari
  2. PT. Koperasi Lntas Usaha Bartim
  3. Jetty Bangun Nusantara Jaya Makmur (BNJM)
  4. Surveyor PT. Asiatrust Techvima Quality  (ATQ)

Dengan isi yaitu :

  • Nama Tongkang dan Tugboat :  TB Lautan berlian 818 (GT 21) / BG. Rezeki Lautan 818 (GT 3420)
  • Pengirim                                       :  PT. Borneo Inter Global ;
Pihak Dipublikasikan Ya